A kitchen refresh
New wall surfaces, flooring, a splashback or work around the worktop may be enough to update the room. We review which cabinets will stay and what finishing is needed before starting.
Kitchen renovations / Helsinki
Renew Construct renovates kitchens in Helsinki, from smaller updates to more extensive projects. The agreed work can combine removal of the old kitchen, room preparation, walls and flooring, installation work and finishing.

A practical cabinet layout may only need new surfaces. If the layout or the whole apartment is changing, the scope and order of work need a broader plan.
New wall surfaces, flooring, a splashback or work around the worktop may be enough to update the room. We review which cabinets will stay and what finishing is needed before starting.
The old kitchen is removed to the agreed extent and the space prepared for its replacement. Removal, preparation, surfaces and installation stages are coordinated.
Kitchen, dining and living room floors and walls can be renewed in one project. The order of work and joins between surfaces are considered across the apartment.
Explore apartment renovationsReal kitchens / Renew projects
In this Helsinki home, light cabinetry, a warm worktop and herringbone flooring changed the feel of the kitchen. The photos show the same space before and after renovation.

A Renew kitchen project combining white cabinetry with dark worktops and an illuminated splashback.

Timber-toned upper cabinets, light lower cabinets and new flooring. This Renew project is located in Vantaa.
The starting point is deciding what stays and what changes. The quote sets out Renew's work and the tasks to coordinate with other contractors.
Removing the agreed cabinets and surfaces, and preparing the space. Any electrical and plumbing disconnections are clarified before work starts.
Levelling, painting, new flooring and other agreed surface work based on the condition of the existing substrates.
Preparing the substrate and completing the agreed splashback finish with the new kitchen dimensions in mind.
Preparing the room and surfaces for installation of the new cabinets, based on your kitchen plan.
The need for building, electrical and plumbing work, and the responsibilities for each, are clarified and fitted into the project schedule.
Trims, joins, surfaces and other agreed details are finished so the kitchen connects neatly with the rest of your home.
Kitchen renovation cost in Helsinki
A small update and a full kitchen renovation have different scopes. Painting and a new splashback involve a different amount of work from removal, layout changes and preparation for a new kitchen.
To prepare an estimate, we need the kitchen size, its current condition and the changes you want. A few photos, details of cabinets you plan to keep and any existing kitchen plan help define the scope.
The labour portion of a kitchen renovation at home may qualify for a tax credit for household expenses when the conditions are met. Check your eligibility and the current rules with the Finnish Tax Administration.
Finnish Tax Administration guidanceBefore renovating, ask your property manager or housing company whether the proposed work requires an alteration notification or other approvals. Changes affecting plumbing, water connections, electrical systems, ventilation or structures should be reviewed during planning.
Tell us if the sink or appliances are moving, or if the extractor connection or layout will change. This helps clarify the work and notifications needed.
Check the housing company's instructions on working hours, access, protection and material deliveries. We also discuss how the renovation will affect use of the kitchen.
Housing-company procedures and required documents vary. Check the requirements for your property before work begins.
How the renovation progresses
Tell us about your Helsinki property and what you want to update. Basic details and photos are enough to get started.
We review the existing condition, the parts to keep and the scope of work.
We agree on the stages, responsibilities, delivery and a schedule suited to your property.
The old kitchen is removed to the agreed extent and the room prepared for new surfaces and cabinetry.
Agreed surfaces, building work and installation stages are completed in the right order.
We finish the details and review the completed work with you.
We serve Helsinki neighbourhoods including Töölö, Lauttasaari, Kallio and Herttoniemi. Our Herttoniemi kitchen reference shows one of our completed local renovations.
Include the location and property type in your quote request. Work in a housing-company apartment or as part of a wider home renovation is scoped around the existing situation.
Work stages, scope and responsibilities are agreed before the renovation starts.
Surfaces, trims and joins are finished as part of the agreed work.
See completed kitchens and the starting point of our Herttoniemi project.
The kitchen can also be renovated as part of a wider apartment renovation.
Frequently asked questions
Answers about scope, cost and practical arrangements in Helsinki housing-company apartments.
A kitchen renovation can include removal, room preparation, wall, floor and splashback surfaces, installation coordination and finishing. Renew's work and other contractors' responsibilities are agreed around the needs of your property.
The cost is assessed based on kitchen size, existing condition and the agreed work. Updating surfaces is a different project from removal, a new cabinet layout and electrical or plumbing changes. Send basic details and photos so we can refine the scope and quote.
Yes, the work can be limited to wall surfaces, flooring or the splashback, for example. The condition of the existing cabinets and the parts you want to keep determine how a partial update can be carried out.
Yes, removal of the old kitchen can be included in the agreed work. Before removal, we review which parts will stay and arrangements for any electrical and plumbing disconnections.
Yes, flooring can be replaced as part of the kitchen renovation. Dining or living room flooring can also be included. The condition of the substrate and cabinet positions are considered when planning the order of work.
A kitchen renovation may require an alteration notification and other approvals, depending on the work. Clarify changes affecting plumbing, water connections, electrical systems, ventilation and structures with your housing company or property manager before starting.
Yes, an existing kitchen plan can be the starting point for the renovation. Send the plan and details of your chosen cabinets and appliances. We use these to agree on Renew's building, surface and finishing work and installation responsibilities.
The duration depends on scope, the condition of existing surfaces, deliveries and installation stages. A property-specific schedule is agreed after the assessment and scope have been defined. We also discuss how the work will affect use of the kitchen.
Tell us about your kitchen's current condition and what you would like to change. Your plan does not need to be final yet — basic details and a few photos will help us get started.