Kitchen renovations / Helsinki

Kitchen renovation in Helsinki

Renew Construct renovates kitchens in Helsinki, from smaller updates to more extensive projects. The agreed work can combine removal of the old kitchen, room preparation, walls and flooring, installation work and finishing.

Renovated Herttoniemi kitchen with white cabinets, a gold-coloured splashback and herringbone flooring
A Renew project · Herttoniemi, Helsinki

What kind of kitchen renovation do you need?

A practical cabinet layout may only need new surfaces. If the layout or the whole apartment is changing, the scope and order of work need a broader plan.

A kitchen refresh

New wall surfaces, flooring, a splashback or work around the worktop may be enough to update the room. We review which cabinets will stay and what finishing is needed before starting.

A more extensive renovation

The old kitchen is removed to the agreed extent and the space prepared for its replacement. Removal, preparation, surfaces and installation stages are coordinated.

Part of an apartment renovation

Kitchen, dining and living room floors and walls can be renewed in one project. The order of work and joins between surfaces are considered across the apartment.

Explore apartment renovations

Real kitchens / Renew projects

A kitchen transformation in Herttoniemi.

In this Helsinki home, light cabinetry, a warm worktop and herringbone flooring changed the feel of the kitchen. The photos show the same space before and after renovation.

Herttoniemi kitchen before renovation with old light cabinets, a timber worktop and a tiled splashback
Before renovation
Finished Herttoniemi kitchen with light panelled cabinet doors, black handles and tap, and herringbone flooring
After renovation
View all projects

Kitchen renovation work agreed around your home

The starting point is deciding what stays and what changes. The quote sets out Renew's work and the tasks to coordinate with other contractors.

Removing the old kitchen

Removing the agreed cabinets and surfaces, and preparing the space. Any electrical and plumbing disconnections are clarified before work starts.

Walls and flooring

Levelling, painting, new flooring and other agreed surface work based on the condition of the existing substrates.

Splashback

Preparing the substrate and completing the agreed splashback finish with the new kitchen dimensions in mind.

Preparation for cabinetry

Preparing the room and surfaces for installation of the new cabinets, based on your kitchen plan.

Coordinating installation

The need for building, electrical and plumbing work, and the responsibilities for each, are clarified and fitted into the project schedule.

Finishing

Trims, joins, surfaces and other agreed details are finished so the kitchen connects neatly with the rest of your home.

Kitchen renovation cost in Helsinki

What affects the cost of a kitchen renovation?

A small update and a full kitchen renovation have different scopes. Painting and a new splashback involve a different amount of work from removal, layout changes and preparation for a new kitchen.

To prepare an estimate, we need the kitchen size, its current condition and the changes you want. A few photos, details of cabinets you plan to keep and any existing kitchen plan help define the scope.

Cost factors include

  • Kitchen size and scope of work
  • Removal and the condition of existing surfaces
  • Floor, wall and splashback work
  • Number of cabinets and installation preparation
  • Electrical and plumbing work, including changes to water connections
  • Work required for appliances
  • Changes to the layout
  • Trims, joins and the extent of finishing

Tax credit for household expenses

The labour portion of a kitchen renovation at home may qualify for a tax credit for household expenses when the conditions are met. Check your eligibility and the current rules with the Finnish Tax Administration.

Finnish Tax Administration guidance

Renovating a kitchen in a Helsinki apartment or terraced home

Before renovating, ask your property manager or housing company whether the proposed work requires an alteration notification or other approvals. Changes affecting plumbing, water connections, electrical systems, ventilation or structures should be reviewed during planning.

Plans and responsibilities

Tell us if the sink or appliances are moving, or if the extractor connection or layout will change. This helps clarify the work and notifications needed.

Practical arrangements

Check the housing company's instructions on working hours, access, protection and material deliveries. We also discuss how the renovation will affect use of the kitchen.

Housing-company procedures and required documents vary. Check the requirements for your property before work begins.

How the renovation progresses

From first contact to final details.

  1. Get in touch

    Tell us about your Helsinki property and what you want to update. Basic details and photos are enough to get started.

  2. Assessment

    We review the existing condition, the parts to keep and the scope of work.

  3. Plan and quote

    We agree on the stages, responsibilities, delivery and a schedule suited to your property.

  4. Removal and preparation

    The old kitchen is removed to the agreed extent and the room prepared for new surfaces and cabinetry.

  5. Renovation and installation

    Agreed surfaces, building work and installation stages are completed in the right order.

  6. Finishing and handover

    We finish the details and review the completed work with you.

Kitchen renovations across Helsinki

We serve Helsinki neighbourhoods including Töölö, Lauttasaari, Kallio and Herttoniemi. Our Herttoniemi kitchen reference shows one of our completed local renovations.

Include the location and property type in your quote request. Work in a housing-company apartment or as part of a wider home renovation is scoped around the existing situation.

Why Renew Construct?

01 /

A clear scope

Work stages, scope and responsibilities are agreed before the renovation starts.

02 /

Careful finishing

Surfaces, trims and joins are finished as part of the agreed work.

03 /

Real projects

See completed kitchens and the starting point of our Herttoniemi project.

04 /

Coordinated work

The kitchen can also be renovated as part of a wider apartment renovation.

Frequently asked questions

Before your kitchen renovation.

Answers about scope, cost and practical arrangements in Helsinki housing-company apartments.

What can a kitchen renovation include?

A kitchen renovation can include removal, room preparation, wall, floor and splashback surfaces, installation coordination and finishing. Renew's work and other contractors' responsibilities are agreed around the needs of your property.

How much does a kitchen renovation cost in Helsinki?

The cost is assessed based on kitchen size, existing condition and the agreed work. Updating surfaces is a different project from removal, a new cabinet layout and electrical or plumbing changes. Send basic details and photos so we can refine the scope and quote.

Can I renovate just part of my kitchen?

Yes, the work can be limited to wall surfaces, flooring or the splashback, for example. The condition of the existing cabinets and the parts you want to keep determine how a partial update can be carried out.

Can you remove the old kitchen?

Yes, removal of the old kitchen can be included in the agreed work. Before removal, we review which parts will stay and arrangements for any electrical and plumbing disconnections.

Can the flooring be replaced at the same time?

Yes, flooring can be replaced as part of the kitchen renovation. Dining or living room flooring can also be included. The condition of the substrate and cabinet positions are considered when planning the order of work.

Does a kitchen renovation need housing-company approval?

A kitchen renovation may require an alteration notification and other approvals, depending on the work. Clarify changes affecting plumbing, water connections, electrical systems, ventilation and structures with your housing company or property manager before starting.

Can you work from an existing kitchen plan?

Yes, an existing kitchen plan can be the starting point for the renovation. Send the plan and details of your chosen cabinets and appliances. We use these to agree on Renew's building, surface and finishing work and installation responsibilities.

How long does a kitchen renovation take?

The duration depends on scope, the condition of existing surfaces, deliveries and installation stages. A property-specific schedule is agreed after the assessment and scope have been defined. We also discuss how the work will affect use of the kitchen.

Planning a kitchen renovation in Helsinki?

Tell us about your kitchen's current condition and what you would like to change. Your plan does not need to be final yet — basic details and a few photos will help us get started.